英語翻譯
英語翻譯
When defining the rules,refer back to the list of field devices developed.Start with the output instructions and work backward to define the condition that produces the desired action.It is important to remember that emergency-stop switches should not be programmed in the programmable controller.Only a hardwired master control relay provides a reliable means for emergency shutdown.These emergency devices should therefore be documented as such.When writing,the text needs to use language that helps convert the operating characteristics to ladder logic.For instance,the AND logic function connects condition instructions in series on a ladder diagram rung,while the OR logic function connects inputs in parallel.
Addressing all elements of a ladder diagram involves identifying and labeling inputs and outputs with a letter/numerical designation.Use an “I” to indicate inputs and an “O” for outputs.(Designating O for zero will prevent confusion between O for output and the number zero).For instance,the first input device is addressed I/O,the second is I/1 and so forth.Outputs are addressed in the same fashion; O/O,O/1,O/2.The program is then downloaded into the programmable controller and ready to be tested.
Installing the Programmable Controller
Before installing the programmable controller,it is necessary to analyze the control cabinet currently housing the relays.Are all the field devices wired to terminal blocks?Or,are all the field devices brought into individual relays scattered throughout the panel?In essence,the engineer will have to mock-up a layout of the cabinet’s contents because the programmable controller typically takes up less space.This is important because if you pull relays out and install a small programmable controller in the middle of the panel,you will find that some of the wires may not reach.If this is the case,you may need to wire in terminal blocks to land the wires coming from the field and then wire from the terminal blocks to the programmable controller.This process is obviously easier when the relays are wired to terminal blocks because you do not have to disturb the field side of the terminal strip wiring -- all you have to do is modify the control side that connects to the programmable controller.At this point the field wires should be labeled with the device names,I/O address or some other identifying code to help document the installation and simplify troubleshooting.Color coding similar characteristics such as AC vs.DC devices further simplifies this process.
When defining the rules,refer back to the list of field devices developed.Start with the output instructions and work backward to define the condition that produces the desired action.It is important to remember that emergency-stop switches should not be programmed in the programmable controller.Only a hardwired master control relay provides a reliable means for emergency shutdown.These emergency devices should therefore be documented as such.When writing,the text needs to use language that helps convert the operating characteristics to ladder logic.For instance,the AND logic function connects condition instructions in series on a ladder diagram rung,while the OR logic function connects inputs in parallel.
Addressing all elements of a ladder diagram involves identifying and labeling inputs and outputs with a letter/numerical designation.Use an “I” to indicate inputs and an “O” for outputs.(Designating O for zero will prevent confusion between O for output and the number zero).For instance,the first input device is addressed I/O,the second is I/1 and so forth.Outputs are addressed in the same fashion; O/O,O/1,O/2.The program is then downloaded into the programmable controller and ready to be tested.
Installing the Programmable Controller
Before installing the programmable controller,it is necessary to analyze the control cabinet currently housing the relays.Are all the field devices wired to terminal blocks?Or,are all the field devices brought into individual relays scattered throughout the panel?In essence,the engineer will have to mock-up a layout of the cabinet’s contents because the programmable controller typically takes up less space.This is important because if you pull relays out and install a small programmable controller in the middle of the panel,you will find that some of the wires may not reach.If this is the case,you may need to wire in terminal blocks to land the wires coming from the field and then wire from the terminal blocks to the programmable controller.This process is obviously easier when the relays are wired to terminal blocks because you do not have to disturb the field side of the terminal strip wiring -- all you have to do is modify the control side that connects to the programmable controller.At this point the field wires should be labeled with the device names,I/O address or some other identifying code to help document the installation and simplify troubleshooting.Color coding similar characteristics such as AC vs.DC devices further simplifies this process.
英語人氣:164 ℃時間:2020-01-27 01:01:36
優(yōu)質(zhì)解答
當定義規(guī)則,參考前面的現(xiàn)場設備的名單中發(fā)展.開始與輸出指令和工作落后的情況下定義生產(chǎn)預期的行動.重要的是要記住,emergency-stop開關(guān)不應該安排上,可編程控制器.只有硬布線主人控制繼電器提供了可靠的手段,緊急停...
我來回答
類似推薦
猜你喜歡
- 1打排球 打籃球 打棒球 用英語
- 2已知G為三角形ABC重心,求證:GA向量+GB向量+GC向量=0,
- 3一個圓柱體的體積是125.6立方厘米,底面直徑是4厘米,它的側(cè)面積是多少平方厘米?
- 4描寫 百合花的作文
- 5These are our skateboard是(就劃線提問)
- 612,1,2月和6,7,8月,3,4,5月和9,10,11月,在南半球各是什么季節(jié)?
- 7on-the-ball
- 8y=f(x)是定義在R上的奇函數(shù),當x>0時f(x)=x²-2x+3,求f(x)在R上的解析式.
- 9把一根長2米的木棒平均截成5段,共需8分鐘,每段長占全長的( )據(jù)一段所需的時間占總時間的()
- 10的作者是誰?
- 11初中趣味科學實驗,急求!
- 1281+691×9簡算