精品偷拍一区二区三区,亚洲精品永久 码,亚洲综合日韩精品欧美国产,亚洲国产日韩a在线亚洲

  • <center id="usuqs"></center>
  • 
    
  • 英語(yǔ)翻譯

    英語(yǔ)翻譯
    Recent studies show that of the amount of time an average part spent in a shop,only a fraction of that time was actually spent in the machining process.Let us assume that a part spent 50 hours from the time it arrived at a plant as a rough casting or bar stock to the time it was a finished product.During this time,it would be on the machine for only 2.5 hours and e cut for only 0.75 hour.The rest of the time would be spent on waiting,moving,setting up,loading,unloading,inspecting the part,setting speeds and feeds,and changing cutting tools.
    NC reduces the amount of non-chip-producing time by selecting speeds and feeds,making rapid moves between surfaces to be cut,using automatic fixtures,automatic tool changing,controlling the coolant,in-process gauging,and loading and unloading the part.These factors,plus the fact that it is no longer necessary to train machine operators,have resulted in considerable savings throughout the entire manufacturing process and caused tremendous growth in the use of NC
    英語(yǔ)人氣:597 ℃時(shí)間:2019-10-18 21:23:04
    優(yōu)質(zhì)解答
    手譯阿,累啊Recent studies show that of the amount of time an average part spent in a shop, only a fraction of that time was actually spent in the machining process. 近期的研究表明每個(gè)部件在店內(nèi)的平均...
    我來(lái)回答
    類似推薦
    請(qǐng)使用1024x768 IE6.0或更高版本瀏覽器瀏覽本站點(diǎn),以保證最佳閱讀效果。本頁(yè)提供作業(yè)小助手,一起搜作業(yè)以及作業(yè)好幫手最新版!
    版權(quán)所有 CopyRight © 2012-2024 作業(yè)小助手 All Rights Reserved. 手機(jī)版