精品偷拍一区二区三区,亚洲精品永久 码,亚洲综合日韩精品欧美国产,亚洲国产日韩a在线亚洲

  • <center id="usuqs"></center>
  • 
    
  • 英語翻譯

    英語翻譯
    In the injection molding process of regular parts the heat
    flow from the polymer melt to the mold wall during the
    filling stage can be neglected due to the short filling times.
    However,the local heat flow has a high impact on the
    polymer flow in the surface structures during the filling
    stage and is considered by a one dimensional heat conduction
    model.The freezing of the polymer melt in surface
    structures depends significantly on the temperature level
    chosen on the mold wall and the glass-transition temperature
    of the amorphous molding material used.
    Therefore,in order to mold surface structures with
    higher qualities a higher mold wall temperature is necessary
    which results in increased cooling time.In contrast,
    parts with a lower surface quality allows for a reduction in
    mold wall temperature.Due to the higher temperature
    gradients occurring in the filling and cooling stages the
    cooling time is then reduced significantly.
    英語人氣:958 ℃時間:2020-06-22 18:21:30
    優(yōu)質(zhì)解答
      在常規(guī)零件注塑成型的過程中,由于充模期短暫,在充模階段熔化到鑄模壁上的聚合體形成的熱流可以忽略不計.然而,在充模階段,表面構(gòu)造中局部的熱流對聚合體具有極高的影響并成為一元熱傳導(dǎo)模型的考慮因素.熔化到表面構(gòu)造的聚合體的凝固大大取決于鑄模壁上選取的溫度位和所用的非晶體成型材料的玻璃化轉(zhuǎn)變溫度.因此,為了以更高質(zhì)量塑造表面結(jié)構(gòu),更高級別的鑄模壁是必要的,這種鑄模壁會造成冷卻時間增加的結(jié)果.相比之下,具有低級別表面質(zhì)量的部件則對鑄模壁溫度降低要求寬松.由于充模和冷卻階段出現(xiàn)的較高溫度的變化率,冷卻時間則會大大減少.
    我來回答
    類似推薦
    請使用1024x768 IE6.0或更高版本瀏覽器瀏覽本站點,以保證最佳閱讀效果。本頁提供作業(yè)小助手,一起搜作業(yè)以及作業(yè)好幫手最新版!
    版權(quán)所有 CopyRight © 2012-2024 作業(yè)小助手 All Rights Reserved. 手機(jī)版