精品偷拍一区二区三区,亚洲精品永久 码,亚洲综合日韩精品欧美国产,亚洲国产日韩a在线亚洲

  • <center id="usuqs"></center>
  • 
    
  • while we check the stock requirement via MD04:the total available stock is 4,but there are 3 delivery order scheduled wi

    while we check the stock requirement via MD04:the total available stock is 4,but there are 3 delivery order scheduled with total qty 20.why current stock is below than scheduled delivery qty.two possible reasons what I thought:1.ATP check is not working while delviery,that means delivery order was created disregard of short stock.but I checked checking rule for delivery and it looks ok.2.when delivery was created,there were enough stock,and some stock was issued to customer or some plants.so current stock looks short.but I checked the material movement document,there isn't special movement type(such as scrapping) and just have normal goods issue/receipt/return.so I am wondering where the stock was going.why current stock 4 is below than scheduled delivery qty since I didnt' see any special inventory adjustment/scrap?any idea on this issue.Thanks for any idea.
    英語人氣:257 ℃時(shí)間:2020-05-14 13:42:10
    優(yōu)質(zhì)解答
    Hi,The scope of the Availability Check must be with RLT time.ThanksVKS查看原帖>>
    我來回答
    類似推薦
    請使用1024x768 IE6.0或更高版本瀏覽器瀏覽本站點(diǎn),以保證最佳閱讀效果。本頁提供作業(yè)小助手,一起搜作業(yè)以及作業(yè)好幫手最新版!
    版權(quán)所有 CopyRight © 2012-2024 作業(yè)小助手 All Rights Reserved. 手機(jī)版