The quantities given in the Bill of Quantities are estimated and provisional,and are given to provide a common basis for bidding.The basis of payment will be the actual quantities of work ordered and carried out,as measured by the Contractor and verified by the Engineer and valued at the rates and prices bid in the priced Bill of Quantities,where applicable,and otherwise at such rates and prices as the Engineer may fix within the terms of the Contract.The rates and prices of major materials (steel pipes,electromagnetic meters and valves) will be paid upon delivered to the site according to the related items in the Technical Specifications.
The quantities given in the Bill of Quantities are estimated and provisional,and are given to provide a common basis for bidding.The basis of payment will be the actual quantities of work ordered and carried out,as measured by the Contractor and verified by the Engineer and valued at the rates and prices bid in the priced Bill of Quantities,where applicable,and otherwise at such rates and prices as the Engineer may fix within the terms of the Contract.The rates and prices of major materials (steel pipes,electromagnetic meters and valves) will be paid upon delivered to the site according to the related items in the Technical Specifications.
英語人氣:466 ℃時間:2020-06-16 15:40:46
優(yōu)質(zhì)解答
工程量清單計(jì)價了臨時的估計(jì),并給出了投標(biāo)提供通用的基礎(chǔ).將會支付的基礎(chǔ)上的實(shí)際數(shù)量的工作有序進(jìn)行,這是通過測量方法進(jìn)行了驗(yàn)證承包商,工程師和價值的費(fèi)率和價格標(biāo)價的投標(biāo),適用于清單計(jì)價,不然在這樣的費(fèi)率和價格...
我來回答
類似推薦
猜你喜歡
- 1把一根木材鋸成6段,共用了12分鐘,平均據(jù)下一段的時間是12分鐘的幾分之幾?
- 21.(x-y)^2-4(x-y+3)
- 3震級與地震烈度的區(qū)別
- 4求一篇80個單詞左右的英語作文 題目最好是介紹我的房間
- 5what a funny story it is(改成同義句)
- 6there are towers a____the ehds of the bridge.
- 7次氯酸鈣次氯酸鈉本身是否具有漂白性
- 8sally is looking at the the plane (和朋友一起)
- 9算式中間一條豎線是什么意思?
- 10一只青蛙在井底.井深10米,青蛙白天往上爬3米,晚上向下滑2米,問青蛙幾天爬上來?
- 11《誰與我同行》閱讀短文答案
- 12除了又香又甜這個詞語,還有沒有別的又什么,回答的時候就給我弄3個就可以了.