精品偷拍一区二区三区,亚洲精品永久 码,亚洲综合日韩精品欧美国产,亚洲国产日韩a在线亚洲

  • <center id="usuqs"></center>
  • 
    
  • 英語翻譯

    英語翻譯
    The next reference position can be obtained by substituting the determined uk+1 value into Eq.(1),which provides a constant feedrate machining.The real-time interpolating accuracy depends on the machining feedrate,system sampling time,and the part curvature radius.The error between the desired curve and the interpolated trajectory is the contour error,which represents the interpolation accuracy.Fig.6 shows the contour error caused by the interpolating result.The federate error and the contour error analyses will be described in the next section.
    The above derivation calculates the trajectory on the part surface,which is the cutter contact (CC) trajectory or path.In 3-D surface machining,ball-end cutters are usually utilised.Therefore,the actual tool path or tool position is an offset of the CC path by a distance equal to the cutter radius with the orientation of the surface normal.Therefore,the tool position can be calculated using,
    英語人氣:653 ℃時(shí)間:2019-10-03 10:07:40
    優(yōu)質(zhì)解答
    下一個(gè)參考位置可以通過逐漸取代英國+ 1值,在確定Eq.(1),它提供了一個(gè)恒切削加工.實(shí)時(shí)插值精度取決于加工刀具、系統(tǒng)采樣時(shí)間、曲率半徑的一部分.預(yù)期之間的誤差曲線插補(bǔ)的輪廓誤差軌跡,體現(xiàn)了插補(bǔ)精度.圖6顯示插值輪...
    我來回答
    類似推薦
    請(qǐng)使用1024x768 IE6.0或更高版本瀏覽器瀏覽本站點(diǎn),以保證最佳閱讀效果。本頁提供作業(yè)小助手,一起搜作業(yè)以及作業(yè)好幫手最新版!
    版權(quán)所有 CopyRight © 2012-2024 作業(yè)小助手 All Rights Reserved. 手機(jī)版