精品偷拍一区二区三区,亚洲精品永久 码,亚洲综合日韩精品欧美国产,亚洲国产日韩a在线亚洲

  • <center id="usuqs"></center>
  • 
    
  • 英語翻譯

    英語翻譯
    Two (2) pilot ladders with rope and timber board construction are also to be provided.These are to be stowed on manually operated drums.
    The main mast aft shall be fitted with necessary seats for fitting two radar scanners,navigation lights,horn and fittings for carrying flag halyards.Climbing rungs of 19mm square bars shall be fitted to the mast for maintenance and access to equipment.Area around the radar scanners shall have a platform and rails suitable for safety and comfort during maintenance
    A forward mast shall be fitted on the forecastle deck.This mast shall be of pipe/plate fabricated structure and shall carry the necessary navigation lights.Climbing rungs shall be fitted.
    Access and limber holes and scallops shall be cut in the structure as indicated on the Construction Plan and as necessary to provide clear and uninterrupted drainage to bilge suctions and pipe accesses.All such holes shall be clearly oxy cut without serration or roughness to minimise risk of cracks in plating and welds
    英語人氣:590 ℃時(shí)間:2020-01-20 06:35:48
    優(yōu)質(zhì)解答
    二(2)用繩子和木材板建設(shè)試點(diǎn)梯子也應(yīng)提供.這些將被存放在鼓手動(dòng)操作.
    主桅桿后部,應(yīng)當(dāng)設(shè)有裝修兩個(gè)雷達(dá)掃描儀,航行燈,喇叭和旗幟halyards配件攜帶必要的席位.攀登19毫米的方形棒材梯級(jí)須安裝到維護(hù)和訪問設(shè)備桅桿上.周圍的雷達(dá)掃描范圍應(yīng)當(dāng)有一個(gè)平臺(tái)和護(hù)欄維修期間的安全和舒適適合
    遠(yuǎn)期肥大,應(yīng)在甲板安裝.這桅桿應(yīng)管/板裝配式結(jié)構(gòu),并應(yīng)進(jìn)行必要的航行燈.攀登梯級(jí)須安裝.
    訪問和準(zhǔn)備活動(dòng)孔扇貝的必受重傷于建設(shè)規(guī)劃,并表示在必要的結(jié)構(gòu)清晰,提供不間斷的排水艙底吸管和管道訪問.所有這些氧孔應(yīng)明確或無齒切割粗糙,以盡量減少電鍍和焊接接頭裂紋風(fēng)險(xiǎn)
    我來回答
    類似推薦
    請(qǐng)使用1024x768 IE6.0或更高版本瀏覽器瀏覽本站點(diǎn),以保證最佳閱讀效果。本頁提供作業(yè)小助手,一起搜作業(yè)以及作業(yè)好幫手最新版!
    版權(quán)所有 CopyRight © 2012-2024 作業(yè)小助手 All Rights Reserved. 手機(jī)版