    1.200mm half round PVC gutter with down pipes@10.14m intervals
    2.alum window top hang with Georgian bar(see win schedule)
    3.Cladding (sheets) screwed to sheet rail bolted to cleats weilded to columns(to detail)
    4.roofing sheets onto sissalation onto angle purlins bolted purlin cleats weilded to spaning member
    5.ridge ventulator to detail
    6.universal beams main beams(connection to Eng detaul)
    7.Suspended floor slab to be given steel trowel finish(To Eng.detail)
    8.Secobndary beams(Connection-to Eng.spec)
    9.Internal pressed steel stairs (to eng.detail)
    10.transparent cladding
    11.150m solid blockwork to be plastered both side and apply 3 coats of emulsion paint
    12.1RC floor slab to eng.detail
    13.stand alone Hoist Lift lift pit to be optional
    14.Universal beams main beam(connection to Eng detaul)
    15.RC Ramp To eng.detail
    還有幾個:sercice balcony,light storage,slidding door,vertical slidding window
    英語人氣:137 ℃時間:2020-06-12 05:30:02
    優(yōu)質解答
    已在hi留言,請查收
    我來回答
    類似推薦
    請使用1024x768 IE6.0或更高版本瀏覽器瀏覽本站點,以保證最佳閱讀效果。本頁提供作業(yè)小助手,一起搜作業(yè)以及作業(yè)好幫手最新版!
    版權所有 CopyRight © 2012-2024 作業(yè)小助手 All Rights Reserved. 手機版