    At the reconnaissance stage,the engineer’s task is ,by cut and try,to determine which routes deserve further study.Terminals of the road and intermediate points through which it must pass form the primary controls .A unique bridge site or single mountain pass also may become a primary control if no alternative exists .Likewise,for scenic highways ,the positions of timbered areas,waterfalls,lakes,and other attractions may be primary controls .Small settements which would be ignored or purposely bypassed in locating principal highways may be primary controls for secondary rosds.Drainage systems,mountain passes,low points in ridges,or swamps in low country,often form secondary controls.Cost factors such as favorable or unfavorable soil conditions,the numbers and sizes of structures,and the amount of excavation and embankment required for satisfactory alignment and grade likewise can be classified as secondary contrils.
    In mountainous country with well-defined summit ranges,there is usuall a suitable pass with possible approaches following along the drainage on both sides.The least expensive and frequently the straightest line may lie just above high water in the streams.Often,however,the rise of the valley or canyon may exceed the maximum permissible grade.Then,if the steam grade is to be followed,extra roadway length must be gained on adjacent mountain spurs,in side canyons,or with switchbacks.
    英語(yǔ)人氣:282 ℃時(shí)間:2020-10-02 05:29:05
    優(yōu)質(zhì)解答
    在偵察階段,工程師的任務(wù)是,藉著傷口和嘗試,決定哪些路徑更進(jìn)一步該得到研究.道路和中間的點(diǎn)完成的它一定通過(guò)哪一個(gè)的終端機(jī)形成主要的控制.如果沒(méi)有替代選擇存在,一個(gè)獨(dú)特橋位置或獨(dú)身者山途徑也可能成為主要的控制...
    我來(lái)回答
    類(lèi)似推薦
    請(qǐng)使用1024x768 IE6.0或更高版本瀏覽器瀏覽本站點(diǎn),以保證最佳閱讀效果。本頁(yè)提供作業(yè)小助手,一起搜作業(yè)以及作業(yè)好幫手最新版!
    版權(quán)所有 CopyRight © 2012-2024 作業(yè)小助手 All Rights Reserved. 手機(jī)版