Changjiang Sanxia
長江三峽
Three Gorges Dam
三峽水壩
Sanxia Water Control Project planning
三峽水利樞紐規(guī)劃
Yangtze River Three Gorges International Tourism Festival
長江三峽國際旅游節(jié)
The key water projects at the Three Gorges on the Yangtze River and at Xiaolangdi on the Yellow River
長江三峽和黃河小浪底水利樞紐工程
The Three Gorges Project on the Yangtze River and the Xiaolangdi Project on the Yellow River successfully completed damming.
長江三峽和黃河小浪底工程成功截流.
Will the Three Gorges Project prove to be a monumental achievement or nothing more than a giant fiasco
三峽工程將成為極大的成功或只是徹底的失敗?
The ship went up the Yangtze Gorges under her own steam.
這艘輪船靠自己的動力逆水駛過了長江三峽.
Hydroelectricity,which will be the energy discharged by the project,causes much less pollution than coal-burning power plants.
三峽工程利用水能發(fā)電,與燃煤電廠相比,可大量地減少污染物的排放.
A comparative analysis of the positive and negative aspects of the Three Gorges Project will perhaps provide us with a better sense of the eventual impact of the massive water control program.
三峽工程利弊的對比分析可能會使我們更清楚地認識這一龐大的治水工程的最終影響.
猜你喜歡
- 1一種電冰箱降價七分之一后,每臺賣八百四十元,這種電冰箱每臺原價()元,降價()元?
- 2把一個圓柱的底面半徑和高都擴大到原來的2倍,新圓柱的體積是320立方厘米,原來圓柱的體積是()立方厘米
- 3英語翻譯
- 4是不是意味不分文理了?江西的
- 5已知a、b、c為不等于零的實數,且a+b+c=0,求a(1/b+1/c)+b(1/c+1/a)+c(1/a+1/b)的值
- 6這句句子有語法錯誤么?
- 7在平面直角坐標系中,角α與β的頂點均為坐標原點O,始邊均為X軸的非負半軸,已知角α的終邊與單位圓交于點P(3/5,4/5),將OP繞點O按逆時針方向旋轉π/4后與角β的終邊OQ重合
- 8m的3次方*m²-3mm四次方-2m²m³=?過程
- 9A怎么讀英文字母
- 10晶的成語
- 11she said she must go to that film because she was___interested in the actors of it.
- 12y=2x/(x的平方+1)的反函數怎么做?