親愛的大衛(wèi),
請見下我的翻譯:-
我們的工程師有最新的三維制圖方法進(jìn)行全面檢查,發(fā)現(xiàn)很難做修改,消除焊接材料在大范圍,并添加了一些插入,然而,他們就會有以下幾個問題同以前的信息,
1.插入的輸水管線等經(jīng)過腔和核心,所以我們得準(zhǔn)備好那輸水管線等所有焊接,因此將輸水管線等使用了.
(二)腔和芯2344淬硬鋼的(?),由于大焊接區(qū)域內(nèi),我們必須采用氬焊方法,它將在某種程度上退火周圍的區(qū)域,所以焊接處大大減少了模具壽命.它還將破碎的鈣/公司,并因此在焊接處新出現(xiàn)的問題是,所以我們很不確定焊接就能很好的工作.
考慮到以上,我們建議重新編排腔和核心和插入與先前的建議,但本廠和一些電極仍然是可用的,不需要再次或重做.
3: if increase rib after we will consider the product as per the attached pictures ejection direction production, by increasing the rib, mould
Open mold product is likely to stay after increase rib here, so we will be in the direction of the top product bottom, then you don't
By considering P20 steel due to insufficient strength diminishes life, while hot mouth into glue also in product bottom, the attachment pictures
And a set of inversion mould drawing, so you will be more understand our ideas
4: CH. 80151_Long - spine this mould our engineers carefully discussed customer mould diagram, think this structure wind
Risk is too big, customer design only by two teams 30x400 diameter of guiding pole to support 270x175x330 lines of bits, intensity is
Totally inadequate, when the mould open, due to do a complete impending, do a itself weight will make guide pin serious distortion
And it is difficult to ensure smooth production mold, perhaps mold testing also carries a lot of risk, because this mould design unreasonable
And now we are not able to supply quotation
英語翻譯
英語翻譯
英文翻譯成中文:
Dear David,
Please see below my translation:-
Our engineers have thoroughly checked the latest 3D drawing and found it is very difficult to do the modification,to remove material will have to weld on a big area and add some inserts,however,they will have the following problems as previous informed,
1.the inserts will pass through the waterlines of cavity and core,so we have to have the waterlines welded and all waterlines will therefore be out of use.
2.the cavity and core are hardened steel (2344?),due to the big welding area,we have to adopt argon welding method,which will to some degree anneal the area around the welding place,so greatly reduce the mould lifetime.It will also make the ca/co broken around the welding place and hence new problems occur,so we are quite not sure the welding will work fine.
Considering the above,we suggest to redo the cavity and core and inserts as previously advised,but the mouldbase and some electrodes are still usable and need not to re-order or redo.
請將下面的中文翻譯為英文
3:假如增加骨位后我們會考慮將產(chǎn)品按附件圖片頂出方向制作,由于增加了骨位,模具
開模后產(chǎn)品很可能留在增加骨位這邊,這樣我們的頂出方向?qū)⒃诋a(chǎn)品底部,這樣你就不
用考慮P20鋼由于強(qiáng)度不夠減少模具壽命,同時熱嘴進(jìn)膠也在產(chǎn)品底部,請看附件圖片
和一套倒裝模具的圖紙,這樣你將更加明白我們的想法
4:CH.80151_Long-spine這套模具我們工程師仔細(xì)討論過客戶的模具圖,認(rèn)為這個結(jié)構(gòu)風(fēng)
險(xiǎn)太大,客戶的設(shè)計(jì)僅僅靠兩支直徑30x400的導(dǎo)柱來支撐270x175x330的行位,強(qiáng)度是
完全不夠的,當(dāng)模具打開時,由于行位完全懸空,行位自身的重量將會使導(dǎo)柱嚴(yán)重變形
,這很難保證模具能順利生產(chǎn),或許試模也存在很大風(fēng)險(xiǎn),由于這套模具設(shè)計(jì)的不合理
,目前我們暫時不能提供報(bào)價(jià)
英文翻譯成中文:
Dear David,
Please see below my translation:-
Our engineers have thoroughly checked the latest 3D drawing and found it is very difficult to do the modification,to remove material will have to weld on a big area and add some inserts,however,they will have the following problems as previous informed,
1.the inserts will pass through the waterlines of cavity and core,so we have to have the waterlines welded and all waterlines will therefore be out of use.
2.the cavity and core are hardened steel (2344?),due to the big welding area,we have to adopt argon welding method,which will to some degree anneal the area around the welding place,so greatly reduce the mould lifetime.It will also make the ca/co broken around the welding place and hence new problems occur,so we are quite not sure the welding will work fine.
Considering the above,we suggest to redo the cavity and core and inserts as previously advised,but the mouldbase and some electrodes are still usable and need not to re-order or redo.
請將下面的中文翻譯為英文
3:假如增加骨位后我們會考慮將產(chǎn)品按附件圖片頂出方向制作,由于增加了骨位,模具
開模后產(chǎn)品很可能留在增加骨位這邊,這樣我們的頂出方向?qū)⒃诋a(chǎn)品底部,這樣你就不
用考慮P20鋼由于強(qiáng)度不夠減少模具壽命,同時熱嘴進(jìn)膠也在產(chǎn)品底部,請看附件圖片
和一套倒裝模具的圖紙,這樣你將更加明白我們的想法
4:CH.80151_Long-spine這套模具我們工程師仔細(xì)討論過客戶的模具圖,認(rèn)為這個結(jié)構(gòu)風(fēng)
險(xiǎn)太大,客戶的設(shè)計(jì)僅僅靠兩支直徑30x400的導(dǎo)柱來支撐270x175x330的行位,強(qiáng)度是
完全不夠的,當(dāng)模具打開時,由于行位完全懸空,行位自身的重量將會使導(dǎo)柱嚴(yán)重變形
,這很難保證模具能順利生產(chǎn),或許試模也存在很大風(fēng)險(xiǎn),由于這套模具設(shè)計(jì)的不合理
,目前我們暫時不能提供報(bào)價(jià)
英語人氣:361 ℃時間:2020-04-01 11:37:26
優(yōu)質(zhì)解答
我來回答
類似推薦
- 英語翻譯
- 英語翻譯
- 翻譯:將中文翻譯成英文.將英文翻譯成中文
- 中文翻譯英文, 英文翻譯中文
- 英語翻譯
- 甲乙兩數(shù)和是50 ,甲數(shù)的3倍于乙數(shù)的4倍的和是165,甲乙兩數(shù)是多少?
- 罐頭廠要給水果罐頭做一種圓柱形的包裝盒,已知這個罐頭盒的底面半徑為5cm,高6cm,同時要在盒的外面貼一
- 等腰三角形腰和底邊長的比是3:2,若底邊長為6,則底邊上的高是多少?腰上的高是多少?
- 填成語啊..平( )無( ) ,形( )影( ) ,()云()霧
- 一個圓柱高9分米,側(cè)面積226.08平方分米,它的底面積是多少平方分米?
- 已知cosa=1/7,cos(a+b)=13/14.且a,b屬于(0,派/2)
- 2.3g鈉由原子變成離子時,失去的電子數(shù)為0.1NA(要過程)
猜你喜歡
- 1一個德語問題
- 2隨機(jī)變量的概率密度問題
- 3一條褲子,原價(jià)120元,提價(jià)30%以后,又因過季降價(jià)30%,現(xiàn)在售價(jià)是多少?
- 4夜間,可看到池水能倒影路燈,若池水深2米,路燈距水面8米燈在水面的像到燈的距離應(yīng)
- 51.將一個長方體平均截成5段,每段長5分米,表面積增加了120平方分米.原來長方體的體積是多少立方分米?
- 6調(diào)節(jié)水龍頭,讓水一滴滴流出,在下方放一盤子,調(diào)節(jié)盤子高度,使水滴碰到盤子時,恰有另一水滴開始下落,而空中還有一滴正在下落的水滴,測出水龍頭到盤子的高度為h(m),從第一
- 7冬天窗戶上為什么會有水蒸氣
- 8質(zhì)量為m的木塊放在水平傳送帶上,隨傳送帶一起向前運(yùn)動,木塊與傳送帶間的動摩擦因數(shù)為μ,則下列說法正
- 9再勇敢些,用英文怎么說.be more modest,對嗎,
- 10已知命題p:方程x2+mx+1=0有兩個不等的負(fù)實(shí)根,命題q:方程4x2+4(m-2)x+1=0無實(shí)根,若p或q為真,p且q為假,則實(shí)數(shù)m的取值范圍是( ?。?A.(1,2]∪[3,+∞) B.(1,2)∪(3,+∞) C.(1,2]
- 11(1)若不等式組(1)x+ab 的解集是-2
- 1264噸硫最能能制取多少硫酸?