5000字,好多哦
這里有一篇翻譯看一下吧!字?jǐn)?shù)達(dá)不到你的要求,僅供參考.
建設(shè)工程設(shè)計(jì)合同(二)
(專業(yè)建設(shè)工程設(shè)計(jì)合同)
Engineering Service Contract (Ⅱ)
(Professional Engineering Service Contract For Construction Project)
工 程 名 稱:
工 程 地 點(diǎn):
合 同 編 號(hào):
(由設(shè)計(jì)人編填)
設(shè)計(jì)證書(shū)等級(jí):
發(fā) 包 人:
設(shè) 計(jì) 人:
簽 訂 日 期:
Name of the project:
Location of the project:
Contract No.:
(Filled in by the Designer)
Level of the design certificate:
Employer:
Designer:
Date of contract: November 25, 2004
監(jiān)制
中華人民共和國(guó)建設(shè)部
國(guó)家工商行政治理部
Supervised by: Jiangsu Provincial Department of Construction
Jiangsu Provincial Administration for Industry and Commerce
發(fā)包人:
設(shè)計(jì)人:
發(fā)包人委托設(shè)計(jì)人承擔(dān) ______________________________工程設(shè)計(jì),工程地點(diǎn)為_(kāi)______________ ,經(jīng)雙方協(xié)商一致,簽訂本合同,共同執(zhí)行.
Employer: (Party A)
Designer: (Party B)
The Employer entrust the Designer to undertake the engineering design of the 10/0.4KV transformer station and the location for the project is within the plant of After friendly consultation, the Parties hereby sign this Contract as follows:
第一條 本合同簽訂論據(jù)
1.1《中華人民共和國(guó)合同法》、《中華人民共和國(guó)建筑法》和《建設(shè)工程勘察設(shè)計(jì)市場(chǎng)治理規(guī)定》.
1.2國(guó)家及地方有關(guān)建設(shè)工程勘察設(shè)計(jì)治理法規(guī)和規(guī)章.
1.3建設(shè)工程批準(zhǔn)文件.
Article 1 Basis for the conclusion of this Contract
1.1 The Contract Law of the People’s Republic of China; The Construction Law of the People’s Republic of China; Regulations on the Administration of the Market for Survey and Design of Engineering Construction.
1.2 National and local rules and regulations on the administration of the market for survey and design of engineering construction
1.3 Approval documents of the engineering construction
第二條 設(shè)計(jì)依據(jù)
2.1發(fā)包人給設(shè)計(jì)人的委托書(shū)或設(shè)計(jì)中標(biāo)文件
2.2發(fā)包人提交的基礎(chǔ)資料
2.3設(shè)計(jì)人采用的主要技術(shù)標(biāo)準(zhǔn)是:
Article 2 Basis for design of the engineering construction
2.1 Letter of Authority or documents on letter of acceptance provided by the Employer to the Designer.
2.2 Basic materials submitted by the Employer.
2.2 The main technological standards adopted by the Designer is as follows:
第三條 合同文件的優(yōu)先次序
構(gòu)成本合同的文件可視為是能互相說(shuō)明的,假如合同文件存在歧義或不一致,則根據(jù)如下優(yōu)先次序來(lái)判定:
3.1合同書(shū)
3.2中標(biāo)函(文件)
3.3發(fā)包人要求及委托書(shū)
3.4投標(biāo)書(shū)
Article 3 Priority of the contractual documents
The several documents forming the Contract are to be taken as mutually explanatory of one another, but in case of ambiguities or discrepancies, the priority of the documents forming, the Contract shall be as follows:
(1) The Contract;
(2) The Letter of Acceptance (documents);
(3) Requirements of the Employer and letter of authority;
(4) The Tender;
第四條 本合同項(xiàng)目的名稱、規(guī)模、階段、投資及設(shè)計(jì)內(nèi)容(根據(jù)行業(yè)特點(diǎn)填寫(xiě))
Article 4 Name, size, stages, investment and content of design(which may be filled in according to the characteristics of the industry)
第五條 發(fā)包人向設(shè)計(jì)人提交的有關(guān)資料、文件及時(shí)間
12.5發(fā)包人委托設(shè)計(jì)人承擔(dān)本合同內(nèi)容以外的工作服務(wù),另行簽訂協(xié)議并支付費(fèi)用.
12.6由于不可抗力因素致使合同無(wú)法履行時(shí),雙方應(yīng)及時(shí)協(xié)商解決.
12.7本合同雙方簽字蓋章即生效,一式_____份,發(fā)包人 _____份,設(shè)計(jì)人_______份.
12.5 Additional agreement for any other service, which Employer entrusts Designer to provide, however, out of the scope of the Contract, shall be signed and the payment shall be paid correspondingly.
12.6 For any failure to perform any term or condition of this Contract due to the force majeure, both parties shall, in good faith, attempt to settle amicably and by mutual agreement.
12.7 The Contract is effective once after both parties stamped and signed. There are totally __3__ copies of the Contract, Employer retains __2__ copies, and Designer retains __1__ copies.
12.8本合同生效后,按規(guī)定應(yīng)到項(xiàng)目所在地省級(jí)建設(shè)行政主管部門(mén)規(guī)定的審查部門(mén)備案;雙方認(rèn)為必要時(shí),到工商行政治理部門(mén)鑒證.雙方履行完合同規(guī)定的義務(wù)后,本合同即行終止.
12.9雙方認(rèn)可的來(lái)往傳真、電報(bào)、會(huì)議紀(jì)要等,均為合同的組成部分,與本合同具有同等法律效力.
12.10未盡事宜,經(jīng)雙方協(xié)商一致,簽訂補(bǔ)充協(xié)議,補(bǔ)充協(xié)議與本合同具有同等效力.
12.8 Once this Contract became effective, it should be registered in the Auditing Section stipulated by Provincial Administrative Ministry of Construction where the Project locates. Where is necessity mutually agreed by both parties, the Contract shall be certified by Local Administration for Industry and Commerce. This Contract is to be concluded once after both parties fulfilled their own responsibilities.
12.9 Any correspondence, include faxes, telegram, meeting minutes agreed by both parties, are components of the Contract, which shall have the same validity with this Contract.
12.10 As for matters not covered in this Agreement, supplementary agreement may be concluded by the Parties separately and such supplementary agreement shall have the same legal validity with this Contract.
發(fā)包人名稱:設(shè)計(jì)人名稱:
(蓋章) (蓋章)
法定代表人:(簽字) 法定代表人:(簽字)
委托代理人:(簽字) 委托代理人:(簽字)
項(xiàng)目經(jīng)理:(簽字)項(xiàng)目經(jīng)理:(簽字)
住所:住所:
郵政編碼:郵政編碼:
電話:電話:
傳真: 傳真:
開(kāi)戶銀行: 開(kāi)戶銀行:
銀行帳號(hào): 銀行帳號(hào):
建設(shè)行政主管部門(mén)備案:鑒證意見(jiàn):
(蓋章) (蓋章)
備案號(hào):經(jīng)辦人:
Name of the Employer: Name of the Designer:
(Stamp) (Stamp)
Legal representative: (signature) Legal representative: (signature)
Authorized proxy: (signature) Authorized proxy: (signature)
Address: Address:
Postal code: Postal code:
Tel.: Tel.:
Fax: Fax:
Bank: Bank:
Bank account: Bank account:
Record at the competent construction administration department: Verification opinion:
(Stamp) (Stamp)
Record No.: Handling person:
Date of record: Date of verification:
英語(yǔ)翻譯
英語(yǔ)翻譯
不好意思 打錯(cuò)了 必須是英譯漢····求好心人···
不好意思 打錯(cuò)了 必須是英譯漢····求好心人···
英語(yǔ)人氣:790 ℃時(shí)間:2020-06-27 01:34:59
優(yōu)質(zhì)解答
我來(lái)回答
類似推薦
猜你喜歡
- 1平面與平面重合,是否屬于平行一類?那重合的兩直線,也屬于平行一類的嗎?
- 2非洲每年因饑餓死亡的人數(shù)及現(xiàn)在饑餓人口數(shù)量拜托各位了 3Q
- 3decide to do sth.還=什么
- 4(7/8)o you think of london?B:5.____london is one of the liveliest cities
- 5啤酒可以托運(yùn)嗎
- 6邊長(zhǎng)為2√6的等邊三角形的中心到一邊的距離為?
- 7please give your hand to help me
- 8已知2的X次方等于3的Y次方等于6的Z次方不等等于1,證明X分之一加Y分之一等于Z分之一.
- 9幫我做做?
- 10機(jī)械分析天平TG628A的使用說(shuō)明書(shū)
- 11in winter ,we wear warm coats to protect our bodies_.
- 12( )was most importance to her ,she told me,was her family it this what as