if the buyer find the Samples of the materials does not meet their environmental requirements ,then the batch of material can be processed by the buyers and the suppliers after their consultation.
If the materials can be Identified to the supplier's responsibility ,the direct or indirect costs for the buyer should be beared by the supplier.
英語翻譯
英語翻譯
若買方抽測出物料不符合環(huán)保要求,則該批物料由買方和供應(yīng)商協(xié)商后進(jìn)行處理.
若確定為供應(yīng)商責(zé)任,買方因此直接或間接受到的損失費用由供應(yīng)商承擔(dān).
若買方抽測出物料不符合環(huán)保要求,則該批物料由買方和供應(yīng)商協(xié)商后進(jìn)行處理.
若確定為供應(yīng)商責(zé)任,買方因此直接或間接受到的損失費用由供應(yīng)商承擔(dān).
英語人氣:933 ℃時間:2020-03-28 01:16:51
優(yōu)質(zhì)解答
我來回答
類似推薦
猜你喜歡
- 1(1)九分之二的分子加4,要使分?jǐn)?shù)大小不變,分母應(yīng)().
- 2They'll stay for five days in Harbin.(對劃線部分提問) ------------
- 3悲憫惻隱之心 義無反顧
- 4一道初中乘方題
- 5將下列句子中的直接引語變?yōu)殚g接引語
- 6it was frist time...that誰能用這個句型造2個句子
- 7三角洲的形成有什么因素
- 81、He read the letter to all his friend【改被動語態(tài)】
- 9在角ABC中,AB=AC AD垂直BC于D角ABC周長的為36,角ABD的周長為30.請你求出AD的長
- 10一個數(shù)與4.85的和是14 1/2,求這個數(shù)《方程式》
- 11一項工程,甲,乙兩個工程隊合作,6天可以完工,現(xiàn)在甲先做4天,乙又接著做8天正好完工.乙每天完%B
- 12英語翻譯