英語翻譯
英語翻譯
The power take-off test will be made consisting of a two hour test at the maximum power specified by the manufacture with a 20 per cent increase in torque applied every five minutes for a period not exceeding one minute.If the engine does not develop the 20 per cent increase in torque the intermittent overload shall be carried out at maximum engine torque.This fact shall be noted in the test report.In either case the maximum power take-off power reported for the two-hour test will be that specified by the manufacturer.
Non-mechanical coupling between engine and power take-off
This will be the case of a fluid or electrical power transmission system with its possible cooling component.The following test conditions and procedures shall apply.
In addition to those required under 4.1.4.1 above,a means shall be provided for measuring the temperature of any non-mechanical components which couple the engine to the power take-off system.
Test procedure
The governor control level being set for maximum power,the system shall be operated at maximum power take-off power for a period sufficient to establish stabilised conditions but not less than two hours.The power take-off system shall be considered stable when two consecutive temperature readings of the cooling device taken 10 minutes apart do not differ by more than 1度
The tractor shall then operate for a period of one hour.The maximum power quoted in the report shall be the average of minimum number of six readings to be evenly spread.If the power take-off or the engine speed deviates by more than 2 percent from the standard power take-off speed or calculated average speed respectively,the test shall be repeated.If the variation continues,the deviation shall be stated in the report.The temperature observed at the critical components of the system shall also be recorded.
A second one-hour test shall be made at the power take-off power level observed above and at the lowest engine speed which will maintain this power at the rated power take-off speed.
A third series of tests shall determine power take-off power at part loads with the governor control set as for the second test.Each test shall last at least 20 minutes and shall be made according to 4.1.1 above.
Performance at the belt or the belt pulley shaft
Test requirements
The tractor pulley shall be connected to that of the dynamometer bench by a belt.This belt shall be flexible and have appropriate power and torque transmission characteristics.Belt slip shall not exceed 2 percent and the necessary tension to obtain this condition shall be as small as possible.
The tests at the pulley shaft shall be conducted by directly coupling the tractor pulley to the dynamometer shaft.
All of the provisions for tests at the main power take-off sha apply to the belt tests and to the pulley shaft tests,with the exception of those at standard power take-off speed and for tractors unable to transmit the full engine power at the power take-off.
If the engine speed recommended by the manufacturer for tests at maximum power does not correspond to a standard belt speed,the operational characteristics of the engine at the speed corresponding to the standard belt speed shall be measured during the full load test.
Test results
The power,belt slip,hourly fuel consumption and specific fuel consumption in relation to engine speed shall be recorded,as in the main power take-off test.
Performance in a hot atmosphere
Test requirements
The power take-off test will be made consisting of a two hour test at the maximum power specified by the manufacture with a 20 per cent increase in torque applied every five minutes for a period not exceeding one minute.If the engine does not develop the 20 per cent increase in torque the intermittent overload shall be carried out at maximum engine torque.This fact shall be noted in the test report.In either case the maximum power take-off power reported for the two-hour test will be that specified by the manufacturer.
Non-mechanical coupling between engine and power take-off
This will be the case of a fluid or electrical power transmission system with its possible cooling component.The following test conditions and procedures shall apply.
In addition to those required under 4.1.4.1 above,a means shall be provided for measuring the temperature of any non-mechanical components which couple the engine to the power take-off system.
Test procedure
The governor control level being set for maximum power,the system shall be operated at maximum power take-off power for a period sufficient to establish stabilised conditions but not less than two hours.The power take-off system shall be considered stable when two consecutive temperature readings of the cooling device taken 10 minutes apart do not differ by more than 1度
The tractor shall then operate for a period of one hour.The maximum power quoted in the report shall be the average of minimum number of six readings to be evenly spread.If the power take-off or the engine speed deviates by more than 2 percent from the standard power take-off speed or calculated average speed respectively,the test shall be repeated.If the variation continues,the deviation shall be stated in the report.The temperature observed at the critical components of the system shall also be recorded.
A second one-hour test shall be made at the power take-off power level observed above and at the lowest engine speed which will maintain this power at the rated power take-off speed.
A third series of tests shall determine power take-off power at part loads with the governor control set as for the second test.Each test shall last at least 20 minutes and shall be made according to 4.1.1 above.
Performance at the belt or the belt pulley shaft
Test requirements
The tractor pulley shall be connected to that of the dynamometer bench by a belt.This belt shall be flexible and have appropriate power and torque transmission characteristics.Belt slip shall not exceed 2 percent and the necessary tension to obtain this condition shall be as small as possible.
The tests at the pulley shaft shall be conducted by directly coupling the tractor pulley to the dynamometer shaft.
All of the provisions for tests at the main power take-off sha apply to the belt tests and to the pulley shaft tests,with the exception of those at standard power take-off speed and for tractors unable to transmit the full engine power at the power take-off.
If the engine speed recommended by the manufacturer for tests at maximum power does not correspond to a standard belt speed,the operational characteristics of the engine at the speed corresponding to the standard belt speed shall be measured during the full load test.
Test results
The power,belt slip,hourly fuel consumption and specific fuel consumption in relation to engine speed shall be recorded,as in the main power take-off test.
Performance in a hot atmosphere
Test requirements
英語人氣:481 ℃時間:2020-04-09 04:25:38
優(yōu)質(zhì)解答
希望給與最佳答案 謝謝和合作起飛測試將包括在最大功率的制造與應(yīng)用每五分鐘為一個周期不超過一分鐘的扭矩增加20%,在兩個小時的測試.如果發(fā)動機不發(fā)展增加20%的扭矩間歇過載,應(yīng)進行發(fā)動機的最大扭矩.在測試報告中...希望給與最佳答案 謝謝這些測試必須在溫度調(diào)節(jié)到= 2。拖拉機連接到測力計板凳,在電源測試。處的空氣溫度在測試過程中,在以下溫度采取:水溫在恒溫器的缸體之前,或在一個空氣冷卻的發(fā)動機的情況下,溫度在由引擎制造者制備點持有的溫度傳感裝置; coooling系統(tǒng)入口;發(fā)動機油溫度,在空氣凈化器入口的空氣溫度;燃料溫度。測試程序發(fā)生的最大功率在額定發(fā)動機轉(zhuǎn)速的調(diào)速器控制桿組的第一個系列的測試。我都翻譯的這么辛苦 你不給最佳答案 你什么心態(tài)那你發(fā)完以后再告訴我
我來回答
類似推薦
- 英語翻譯
- 英語翻譯
- 英語翻譯
- 我們才能夠完成這項任務(wù).用英語怎么翻譯
- 仿照 I imagine (that) a lot of people will come to the food festival.寫四個句子.
- 現(xiàn)在在高一.初中英語和基本沒學(xué).現(xiàn)在補英語的話能補上么.還有就是我現(xiàn)在有一套新概念.我是以新概念為主還是課本呢.現(xiàn)在學(xué)校發(fā)的題90%看不明白.要是補的話能不能有希望啊.
- 17.Because air pollution has been greatly reduced,this city is still _______.
- 一棵樹在離地面9米處斷裂,樹的頂部落在離底部12米處,這棵樹折斷之前是多少米.
- 一道除法算式中,被除數(shù)加上除數(shù),與商的積是80,被除數(shù)是
- 物體做初速度為零的勻加速直線運動,在第3S、第4S內(nèi)的總位移是1.2M,則第5S內(nèi)的位移是多少?
- 魯迅《雪》閱讀答案,
- 試比較雙子葉植物莖和單子葉植物莖初生結(jié)構(gòu)的不同
猜你喜歡
- 18(x一6.2)=41.6這方程咋解
- 2請問情態(tài)動詞和助動詞有哪些 他們有什么區(qū)別?是不是情態(tài)動詞和助動詞后面都要跟動詞原形?
- 3硝酸鉀屬于復(fù)合肥嗎
- 4I'm sure you are b_____ .you can stay at home by yourself.
- 5"瘠"怎么讀
- 6送別同學(xué)的詩歌
- 7________ _________ does it take to go from my home to the school by car?Twenty minutes.
- 8寫一篇英語短文,10句,描述一只動物
- 9they的賓格形式
- 10競選班長發(fā)言稿400字左右
- 11有小學(xué)生、中學(xué)生和大學(xué)生共405人參加節(jié)目聯(lián)歡會,他們?nèi)藬?shù)的比是2:三分之一:1.要算式,
- 12英語翻譯