精品偷拍一区二区三区,亚洲精品永久 码,亚洲综合日韩精品欧美国产,亚洲国产日韩a在线亚洲

  • <center id="usuqs"></center>
  • 
    
  • 英語翻譯

    英語翻譯
    The power take-off test will be made consisting of a two hour test at the maximum power specified by the manufacture with a 20 per cent increase in torque applied every five minutes for a period not exceeding one minute.If the engine does not develop the 20 per cent increase in torque the intermittent overload shall be carried out at maximum engine torque.This fact shall be noted in the test report.In either case the maximum power take-off power reported for the two-hour test will be that specified by the manufacturer.
    Non-mechanical coupling between engine and power take-off
    This will be the case of a fluid or electrical power transmission system with its possible cooling component.The following test conditions and procedures shall apply.
    In addition to those required under 4.1.4.1 above,a means shall be provided for measuring the temperature of any non-mechanical components which couple the engine to the power take-off system.
    Test procedure
    The governor control level being set for maximum power,the system shall be operated at maximum power take-off power for a period sufficient to establish stabilised conditions but not less than two hours.The power take-off system shall be considered stable when two consecutive temperature readings of the cooling device taken 10 minutes apart do not differ by more than 1度
    The tractor shall then operate for a period of one hour.The maximum power quoted in the report shall be the average of minimum number of six readings to be evenly spread.If the power take-off or the engine speed deviates by more than 2 percent from the standard power take-off speed or calculated average speed respectively,the test shall be repeated.If the variation continues,the deviation shall be stated in the report.The temperature observed at the critical components of the system shall also be recorded.
    A second one-hour test shall be made at the power take-off power level observed above and at the lowest engine speed which will maintain this power at the rated power take-off speed.
    A third series of tests shall determine power take-off power at part loads with the governor control set as for the second test.Each test shall last at least 20 minutes and shall be made according to 4.1.1 above.
    Performance at the belt or the belt pulley shaft
    Test requirements
    The tractor pulley shall be connected to that of the dynamometer bench by a belt.This belt shall be flexible and have appropriate power and torque transmission characteristics.Belt slip shall not exceed 2 percent and the necessary tension to obtain this condition shall be as small as possible.
    The tests at the pulley shaft shall be conducted by directly coupling the tractor pulley to the dynamometer shaft.
    All of the provisions for tests at the main power take-off sha apply to the belt tests and to the pulley shaft tests,with the exception of those at standard power take-off speed and for tractors unable to transmit the full engine power at the power take-off.
    If the engine speed recommended by the manufacturer for tests at maximum power does not correspond to a standard belt speed,the operational characteristics of the engine at the speed corresponding to the standard belt speed shall be measured during the full load test.
    Test results
    The power,belt slip,hourly fuel consumption and specific fuel consumption in relation to engine speed shall be recorded,as in the main power take-off test.
    Performance in a hot atmosphere
    Test requirements
    英語人氣:481 ℃時間:2020-04-09 04:25:38
    優(yōu)質(zhì)解答
    希望給與最佳答案 謝謝和合作起飛測試將包括在最大功率的制造與應(yīng)用每五分鐘為一個周期不超過一分鐘的扭矩增加20%,在兩個小時的測試.如果發(fā)動機不發(fā)展增加20%的扭矩間歇過載,應(yīng)進行發(fā)動機的最大扭矩.在測試報告中...希望給與最佳答案 謝謝這些測試必須在溫度調(diào)節(jié)到= 2。拖拉機連接到測力計板凳,在電源測試。處的空氣溫度在測試過程中,在以下溫度采取:水溫在恒溫器的缸體之前,或在一個空氣冷卻的發(fā)動機的情況下,溫度在由引擎制造者制備點持有的溫度傳感裝置; coooling系統(tǒng)入口;發(fā)動機油溫度,在空氣凈化器入口的空氣溫度;燃料溫度。測試程序發(fā)生的最大功率在額定發(fā)動機轉(zhuǎn)速的調(diào)速器控制桿組的第一個系列的測試。我都翻譯的這么辛苦 你不給最佳答案 你什么心態(tài)那你發(fā)完以后再告訴我
    我來回答
    類似推薦
    請使用1024x768 IE6.0或更高版本瀏覽器瀏覽本站點,以保證最佳閱讀效果。本頁提供作業(yè)小助手,一起搜作業(yè)以及作業(yè)好幫手最新版!
    版權(quán)所有 CopyRight © 2012-2024 作業(yè)小助手 All Rights Reserved. 手機版