32.0 Construction of expansion joints
.The materials given above shall be used for the following situations as detailed:
a.Between 2 roofs at the same level
Cast 200mm high x 150mm wide up-stand integrally with roof slab each side of
joint,containing water stop 75mm below top and fixing blocks on both sides at
450mm centres.After asphalting to top edge of up-stands,pin 3mm G.I.straps
40mm wide x 225mm long,with min.2 nos.galvanized nails to each fixing block.
Provide 450mm wide flashing with rolled or braxed joints along length of joint,and
fold down outer 40mm each side.Carry flashing 150mm up into parapet wall at
each end.The top surface of the flashing is to fall away from the joint.The
flashing is to be fixed to the zinc sheet strips by folding the outer edge a second
time incorporating the strip in the fold.
b.Between a roof and a vertical face
The roof side of the joint is to be identical with (a) above.The flashing need only
be 400mm wide and wall side is to be carried up 150mm,folded towards the wall,
set into a groove and fixed as specified.
c.In floors exposed to weather (access balconies,etc.,)
Cast a water stop in the floor slab throughout the length of the joint.Carry this
continuously up parapets and external walls.Provide floor joint cover along
length of floor finishes.
d.In floors not exposed to weather
Use floor joint cover only.
e.In external walls and column faces
Cast in a water stop continuously throughout the face of the building.Use a
mastic filler with its outer face recessed 13mm behind the finished surface on the
external face.
f.In internal wall faces and ceilings
Rake out joint 60mm deep and install a joint cover.
In all cases,structural elements or structural and non-structural elements on each side of
a joint shall be separated by a filler throughout the height and width of the building.
英語翻譯
英語翻譯
32.0 Construction of expansion joints
.The materials given above shall be used for the following situations as detailed:
a.Between 2 roofs at the same level
Cast 200mm high x 150mm wide up-stand integrally with roof slab each side of
joint,containing water stop 75mm below top and fixing blocks on both sides at
450mm centres.After asphalting to top edge of up-stands,pin 3mm G.I.straps
40mm wide x 225mm long,with min.2 nos.galvanized nails to each fixing block.
Provide 450mm wide flashing with rolled or braxed joints along length of joint,and
fold down outer 40mm each side.Carry flashing 150mm up into parapet wall at
each end.The top surface of the flashing is to fall away from the joint.The
flashing is to be fixed to the zinc sheet strips by folding the outer edge a second
time incorporating the strip in the fold.
b.Between a roof and a vertical face
The roof side of the joint is to be identical with (a) above.The flashing need only
be 400mm wide and wall side is to be carried up 150mm,folded towards the wall,
set into a groove and fixed as specified.
c.In floors exposed to weather (access balconies,etc.,)
Cast a water stop in the floor slab throughout the length of the joint.Carry this
continuously up parapets and external walls.Provide floor joint cover along
length of floor finishes.
d.In floors not exposed to weather
Use floor joint cover only.
e.In external walls and column faces
Cast in a water stop continuously throughout the face of the building.Use a
mastic filler with its outer face recessed 13mm behind the finished surface on the
external face.
f.In internal wall faces and ceilings
Rake out joint 60mm deep and install a joint cover.
In all cases,structural elements or structural and non-structural elements on each side of
a joint shall be separated by a filler throughout the height and width of the building.
32.0 Construction of expansion joints
.The materials given above shall be used for the following situations as detailed:
a.Between 2 roofs at the same level
Cast 200mm high x 150mm wide up-stand integrally with roof slab each side of
joint,containing water stop 75mm below top and fixing blocks on both sides at
450mm centres.After asphalting to top edge of up-stands,pin 3mm G.I.straps
40mm wide x 225mm long,with min.2 nos.galvanized nails to each fixing block.
Provide 450mm wide flashing with rolled or braxed joints along length of joint,and
fold down outer 40mm each side.Carry flashing 150mm up into parapet wall at
each end.The top surface of the flashing is to fall away from the joint.The
flashing is to be fixed to the zinc sheet strips by folding the outer edge a second
time incorporating the strip in the fold.
b.Between a roof and a vertical face
The roof side of the joint is to be identical with (a) above.The flashing need only
be 400mm wide and wall side is to be carried up 150mm,folded towards the wall,
set into a groove and fixed as specified.
c.In floors exposed to weather (access balconies,etc.,)
Cast a water stop in the floor slab throughout the length of the joint.Carry this
continuously up parapets and external walls.Provide floor joint cover along
length of floor finishes.
d.In floors not exposed to weather
Use floor joint cover only.
e.In external walls and column faces
Cast in a water stop continuously throughout the face of the building.Use a
mastic filler with its outer face recessed 13mm behind the finished surface on the
external face.
f.In internal wall faces and ceilings
Rake out joint 60mm deep and install a joint cover.
In all cases,structural elements or structural and non-structural elements on each side of
a joint shall be separated by a filler throughout the height and width of the building.
其他人氣:332 ℃時間:2020-03-26 02:40:12
優(yōu)質(zhì)解答
我來回答
類似推薦
- 英語翻譯
- 英語翻譯
- 英語翻譯
- 有關(guān)眼的成語?
- 英語翻譯:只有這樣,我才能為自己增值.
- 哥德巴赫猜想1+2具體是怎樣證明的?
- 數(shù)學作輔助線時是用虛線還是實線?
- 下列不能解除植物頂端優(yōu)勢的措施是( ?。?A.去掉頂芽 B.在去掉頂芽的斷口處放上瓊脂小塊 C.在去掉頂芽的斷口處放一塊含有生長素的羊毛脂 D.在去掉頂芽的斷口處放一塊含有細胞分裂素
- 用英語描述自己的外貌5句或5句以上
- You can be——( 介詞 )the festival in your school?
- ∫x^3dx/(x^4-x^2+2)
- 1·方程2X+A=1與方程2/1X+3=x+4的解互為倒數(shù),求關(guān)Y的方程9-3Y=2分之1A+5的解.(字母我是打的大寫)(要算式,看的懂的.)(七年級的內(nèi)容)
猜你喜歡
- 1人體所必需的營養(yǎng)素是什么
- 2mx-2y=5+6x是二元一次方程組,則m的取值范圍是
- 3正比例函數(shù)是特殊的一次函數(shù),那么可以說一次函數(shù)是正比例函數(shù)嗎?
- 4宇宙外面是什么東東?
- 5百靈鳥用修辭手法寫句子越短越好
- 6已知函數(shù)f(x+1)=3x+2,則f(x)的解析式是( ?。?A.3x-1 B.3x+1 C.3x+2 D.3x+4
- 7非洲氣候特點
- 8小明騎一輛車輪直徑72㎝的自行車,要通過一條1130.4m長的大橋,按每分鐘100圈計算,需要幾分鐘
- 9在銳角三角形中,AC等于8,BC等于7,sinB等于7分之4倍根3,求AB~...
- 10某養(yǎng)殖專業(yè)戶養(yǎng)的雞是鵝的7分之3,是鴨的5分之3.該養(yǎng)殖專業(yè)戶養(yǎng)了鵝1400只,
- 11我有一個幸福的家庭 用英語怎么說?
- 12鈉放在水中會發(fā)生怎樣的反應(yīng)?