精品偷拍一区二区三区,亚洲精品永久 码,亚洲综合日韩精品欧美国产,亚洲国产日韩a在线亚洲

  • <center id="usuqs"></center>
  • 
    
  • 英語翻譯

    英語翻譯
    the cavity and or core block can be removed from the parting line of the tool without removing the mold from the press.To accomplish this it requires less clearance in the support plate so that the ejector pins retain alignment once the cavity block is removed.The ejector pin holes will require a gradual transition from a clearance diameter in the rear of the block to a tight fit at the front of the block.This is most often accomplished with a double pass wire edm process,one pass cuts the taper for clearance and the second cut finishes the fit diameter for a length of 2-3 times the ejector pin diameter.The cavity and core blocks also require bolts that are accessible from the parting line and usually also have a jack screw thread machined into the bolt clearance diameter so that smaller bolts can be used to jack the cavity block out of a pocket.It is often common for this type of construction to also include a wedge block to force a row of cavities together before the final tightening of the mounting bolts.
    客戶要做模具,這一點(diǎn)很重要的,怕給翻譯錯(cuò)了.
    英語人氣:697 ℃時(shí)間:2020-04-08 21:34:46
    優(yōu)質(zhì)解答
    上,下模在壓力機(jī)要能夠分開(抜模),因此,要求托板間隙要小,上模一旦拔出,定位銷要成一直線,定位銷要有錐度,上模入槽前與銷孔達(dá)到適度(滑動(dòng))配合,這通常用電火花分兩次加工,先加工錐度,再加工適度配合部分,其長度...
    我來回答
    類似推薦
    請(qǐng)使用1024x768 IE6.0或更高版本瀏覽器瀏覽本站點(diǎn),以保證最佳閱讀效果。本頁提供作業(yè)小助手,一起搜作業(yè)以及作業(yè)好幫手最新版!
    版權(quán)所有 CopyRight © 2012-2024 作業(yè)小助手 All Rights Reserved. 手機(jī)版